Summary
project_id | project_description | year | month | mwa_array_configuration | mode | dataquality | observations | avg_good_tiles_pct | archived_terrabytes | total_downloads |
---|---|---|---|---|---|---|---|---|---|---|
D0004 | Director's time allocated to testing the voltage capture system. | 2013 | 9 | Phase I | NO_CAPTURE | 1 Good | 4 | 98 | 7.717 | 0 |
Detail