Delete Request 52
Summary
project_id | project_description | year | month | mwa_array_configuration | mode | dataquality | observations | avg_good_tiles_pct | archived_terrabytes | total_downloads |
---|---|---|---|---|---|---|---|---|---|---|
G0092 | (P.I. N. Hurley-Walker) Timing and spectropolarimetric observations of a long-period radio transient. Continues D0038. | 2023 | 9 | Phase II Compact | MWAX_VCS | 1 Good | 26 | 91 | 185.175 | 0 |
G0092 | (P.I. N. Hurley-Walker) Timing and spectropolarimetric observations of a long-period radio transient. Continues D0038. | 2023 | 10 | Phase II Compact | MWAX_VCS | 1 Good | 13 | 90 | 92.934 | 0 |
G0092 | (P.I. N. Hurley-Walker) Timing and spectropolarimetric observations of a long-period radio transient. Continues D0038. | 2023 | 11 | Phase II Compact | MWAX_VCS | 1 Good | 1 | 88 | 7.172 | 0 |
Detail